In Madrid Metro services resumed after interruptions on three lines. Early on Friday morning, 27 November 2026, sections of lines 3, 7 and 9 were temporarily closed in both directions. According to the operator, Metro de Madrid trains were running again on all three affected sections by 7.30 am at the latest.
On line 3, services between El Casar and Villaverde Alto were interrupted. The company cited technical causes but gave no further details. Services resumed at 7.00 am. According to the newspaper 20minutos, the interruption lasted less than an hour.
On line 7, trains could not run between García Noblejas and Cartagena at the start of service. The operator also cited technical reasons there. The route was clear again by 7.30 am. According to 20minutos, the interruption began at 6.00 am and therefore lasted about an hour and a half.
On line 9, a train was affected by a fault between Rivas Futura and Puerta de Arganda Services there were interrupted in both directions at 6.43 am and resumed at 7.30 am. This amounts to 47 minutes. Reports did not give further details of the type of fault affecting the train.
Each closure affected an individual section of track, not an entire line. The information about the causes on lines 3 and 7 does not clarify what technical problems occurred in either case. The published information does not indicate any connection between these two incidents or the disruption on line 9.
On Thursday, problems had already been reported on several Metro lines following a power supply interruption, according to a report by Madrid local outlet Gacetín Madrid. This does not establish a connection with Friday’s disruptions.
The resumption of services does not in itself indicate whether all trains immediately returned to the timetable. The reports reviewed gave no specific information about any further delays, replacement services or the number of passengers affected. All times refer to local time in Madrid.
Editor: Mira Cadena (Article created with AI assistance).