Latest

Iryo highlights the reliability of its trains after the accident near Urda

Following the collision between an AVE and an Iryo train on the Madrid–Seville line near Urda on 28 October 2026, Iryo has stressed the operational capability and maintenance of its trains in official statements, while investigations into the events are under way…

Briefing

On 28 October 2026, a collision occurred on the Madrid–Seville high-speed line near Urda (Toledo), involving a Renfe AVE and the Iryo-train 6076. Iryo confirmed in a written statement that the service involved, train 6076, was carrying 147 passengers and its regular crew, and that it immediately activated emergency protocols and support for relatives and those affected. The company also stressed that its trains were properly maintained and had the required safety clearances. (Iryo).

Independent media reports and official bodies are currently investigating the exact sequence of events. According to information published so far, the Iryo train was stationary because of a fault in the system used on the corridor, LZB ; later, the AVE 2080 was signalled to resume its journey. The Minister for Transport noted that events at the signal box and the protocols triggered are part of the investigation (Ministerio de Transportes).

Fabrizio Favara, Iryo’s managing director, had previously told the Senate about problems restarting trains after an LZB failure; that statement is now being considered as part of the investigations. Adif as infrastructure operator, has identified operational records and communications with train drivers as important evidence. Prosecutorial and technical investigations are to establish whether the cause was operational misjudgements or technical faults.

The situation remains sensitive for travellers on the corridor: operators have temporarily suspended or adjusted services between Madrid and Andalusia; passengers can change their tickets or request a refund. The editorial assessment emphasises that Iryo does not deny immediate responsibility for the cause, but points to the maintenance and inspection status of its fleet to date. Until the forensic analysis of the recordings and the findings of the investigations are available, no definitive statements about the cause and responsibility are possible.

Editor: Mira Cadena (Article created with AI assistance).

Sources